User Tools

Site Tools


199803

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
199803 [2016/05/14 09:17] – [Walking Abandoned Railways] kennettj199803 [2016/05/14 09:19] – [Kakadu: Help Safeguard This World Heritage Area] kennettj
Line 205: Line 205:
 Committee 1998/99 Committee 1998/99
  
-Committee Positions  +Committee Positions \\
 President Eddy Giacomel\\ President Eddy Giacomel\\
 Vice-president Tony Holgate\\ Vice-president Tony Holgate\\
Line 221: Line 220:
 Members Representatives Elwyn Morris, Louise Verdon Members Representatives Elwyn Morris, Louise Verdon
  
-Non-Committee Positions +Non-Committee Positions\\
 Confederation Delegates Bill Holland, Tom Wenman\\ Confederation Delegates Bill Holland, Tom Wenman\\
 Magazine Production Manager Frances Holland\\ Magazine Production Manager Frances Holland\\
Line 273: Line 271:
 What you can do to help: What you can do to help:
  
-• Write to politicians and express your horror. Ask friends, colleagues and family to do the same. +• Write to politicians and express your horror. Ask friends, colleagues and family to do the same.\\ 
- +• Attend the RALLY  on Sunday 5th April, 12pm at First Fleet Park, Circular Quay- speakers, music, cultural events. This is an issue of concern to all Australians.\\ 
-• Attend the RALLY  on Sunday 5th April, 12pm at First Fleet Park, Circular Quay- speakers, music, cultural events. This is an issue of concern to all Australians. +• Make a donation of your time or funds to the Jabiluka Campaign c/- The Wilderness Society, PO Box 928, Broadway 2037.\\
- +
-• Make a donation of your time or funds to the Jabiluka Campaign c/- The Wilderness Society, PO Box 928, Broadway 2037. +
 • Visit Kakadu now. The Mirrar Aboriginal people are arranging a blockade at the proposed mine site starting on 23rd March 1998. Transport available. • Visit Kakadu now. The Mirrar Aboriginal people are arranging a blockade at the proposed mine site starting on 23rd March 1998. Transport available.
  
199803.txt · Last modified: 2016/05/14 09:21 by kennettj

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki